Our Service Portfolio
- Precise set up of equipment to make future operation and Service easier
- Supervision of installation by Kelvion experts
- Supply of highest quality spare parts (like gaskets, spare plates, plate packages)
- Supply of spare parts of other brands
- Exclusive stock: Reservation of critical spare parts to guarantee flexibility and quickest delivery
- Tools (ratchet, screwdriver, etc.)
- Cleaning: Improvement of the thermodynamic performance and optimisation of the efficiency
- Reconditioning: Recovery of the thermo-dynamic performance
- Repair of the equipment
- Replacement of unsafe, worn, or damaged parts
- Full Service: Removal of the plate packs, transport to service plant, reconditioning of plate packs, return transport, installation and pressure test, handover to the customer
- Increase of capacity, cost reduction, extension of service intervals or achievement of more efficient heat transfer by redesigning your current solution
- Improvement of the overall performance and lifetime extension of your equipment by updating to the latest technology
- Usage of Inline-Filters eliminate the need to open the plate pack and clean the individual heat exchange plates please contact us for further information
- Troubleshooting: Detection of the root cause of a major issue by applying our extensive product and process knowledge
- Condition audit: Integrity tests at the equipment to detect internal leakages followed up by test reports and expert recommendations
- Remote support: Hotline support with direct access to experts
- Staff training to increase knowledge and competencies of your maintenance staff
- Annual service agreement
PERFORMANCE AUDIT PROGRAMME
We also have a regular performance audit program, which enables customers to avoid unscheduled downtime, plan for future component replacements and extend the lifetime of the equipment.
Report details can be used by our customers to address immediate attention items, as well as plan for future component replacements like plates, gaskets, etc.
RECONDITIONING PROCESS
Our 10-Step-Process for installing new gaskets equals a first-class result. First we inspect the equipment before removing the old gasket and cleaning the plates. This is followed by a dye test and second inspection, removal of the dye residue, cleaning the gasket groove and final plate inspections. The new plates are then fitted and quality checked.
10-Step-Process at a glance:
- Initial inspection & creation of report
- Removal of old gaskets
- Chemical cleaning (acid or caustic bath), high pressure cleaning
- Dye test and second inspection (record results)
- Removal of residues after dye penetration test
- Cleaning of gasket groove
- Final inspection of each plate; replacement of damaged plates
- New gaskets are fitted
- For glued gaskets – tensioning of plate pack and glue curing in an oven
- Final stamp of approval after final inspection and careful packaging of plate pack
HYDROGEN LEAKAGE TEST
Plate heat exchangers can sometimes be exposed to external influences that may cause microscopic leaks. With our innovative leakage test we can track down any material fatigue by feeding a hydrogen/nitrogen mixture into the closed plate heat exchanger on the water side. This is faster and more efficient than conventional methods and can also be used as a preventative tightening test.
Hydrogen Leak Detector EcoSafe 2000
- Robust and simple construction for industrial surrounding
- Fast response behavior
- Early detection of material fatigue
- Mobile and can be applied at short notice
- 10% hydrogen result in 100% safety
- Proven product quality management